-
Webinar: Geoforensic Study for Block Wall Failure
Webinar: Geoforensic Study for Block Wall Failure
Description A segmented block wall detention pond structure was built in 2023 at a site located in Texas. The 17-ft tall wall
Description A segmented block wall detention pond structure was built in 2023 at a site located in Texas. The 17-ft tall wall
Description Government Relations University ASCE’s GRII Team has shared experiences in federal, state, and local government advocacy, public and media relations, grassroots